Key design elements
- Modernized traffic signal at 181st Avenue and Sandy Boulevard
- Add a second westbound left-turn lane, from Sandy Boulevard to 181st Avenue
- New 12-foot wide multi-use path on the north side of Sandy Boulevard, between 185th Drive and 201st Ave., connecting to the Gresham Fairview Trail
- New 12-foot wide multi-use path on the south side of Sandy Boulevard, between 18st Avenue and the Boeing entrance
- New bike lanes
- Restriping of existing lanes to provide a five-land major arterial cross section
- New street trees, rain gardens, planter strips and street lights
Funding
The City of Gresham was awarded $3,644,000 in grant funds for Sandy Boulevard through Metro’s Regional Flexible Fund Allocation.
The grant funds will construct freight-access improvements, mobility, and multi-modal improvements along Sandy Boulevard from 181st Avenue to 201st Avenue.
Funding includes a combination of Federal-Aid Surface Transportation Program (STP) funds and Gresham Urban Renewal funds.